AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red
AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red

AFE 2018-2020 Kia Stinger 19-22 G70 BladeRunner 3in Aluminum Hot Charge Pipe Red

AFE46-20508-R

Regular price $452.00 Sale price$419.85
/
Shipping calculated at checkout.

  • Fast Shipping Available
Smooth transitions in the mandrel-bent aluminum pipes decrease turbulence and minimize pressure loss, increasing horsepower and torque. This kit includes high-quality, stainless-steel, spring-loaded T-bolt clamps and heavy-duty, 5-ply, polyester reinforced silicone couplings. These charge pipes feature factory style billet aluminum quick-connect adapter with an o-ring to ensure a leak-free fit while maintaining superior strength and durability. Finished in textured red powder coating with a unique laser-etched aFe power logo for a custom look.
Installation Instructions


This Part Fits:

Year Make Model Submodel
2019 Genesis G70 Advanced
2020-2022 Genesis G70 Base
2019 Genesis G70 Design
2019 Genesis G70 Dynamic
2019-2020 Genesis G70 Elite
2022 Genesis G70 Launch Edition
2019-2021 Genesis G70 Prestige
2019,2021 Genesis G70 Sport
2018-2021 Kia Stinger GT
2018-2022 Kia Stinger GT1
2018-2023 Kia Stinger GT2
2019 Kia Stinger GTS

We use UPS, FedEx, DHL, and USPS for deliveries. We are not responsible for any shipping problems and shall not be held liable for any "reasonable" delay beyond our advertised delivery time-frames. Shipment by Ground Courier can take up to 15 business days for delivery. Express Courier can take up to 3 business days for delivery. Shipping time frames are once the order has been processed. Due to high demand, order processing can take 5 to 7 business days.

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.